Loading...

Withings Body BMI Wi-Fi Digital Glass Scale - Black (WBS06)

Withings Body BMI Wi-Fi Digital Glass Scale - Black (WBS06)

$119

Withings Body BMI Wi-Fi Digital Glass Scale - Black (WBS06)

WBS06-WHITE
Withings Body BMI Wi-Fi Digital Glass Scale in sleek white
$119
Find in store
Description

Step into data-driven wellness with the Withings Body BMI Scale. Your next best health companion, this device enables you to measure your weight, calculate BMI, view your progress via weight trends, and even check today’s weather forecast. It also supports the Withings app, so you can conveniently set goals and check personalised health insights using your smartphone. Additionally, this unit allows up to 8 users and packs dedicated modes to accommodate different lifestyles.

Key Features

  • Premium Accountability Partner: Transform your wellness routine and understand yourself better with the Withings Body BMI Wi-Fi Digital Glass Scale. Providing reliable weight and BMI measurements, this unit enables you to track your progress toward your fitness goals. It also offers a weight trend feature, which will show your last 8 weigh-ins to keep you motivated.
  • Tiny Steps, Big Care: To adapt to your needs, this Withings Scale has a Baby Mode that allows you to weigh your little one accurately. Just carry your baby while you step on the scale, and the technology will accurately track their weight.
  • Weather Monitoring: Know what’s ahead before you start your day. Withings Body delivers localised weather forecasts the moment you step on the scale.
  • Beyond Figures: The Body Digital Scale works with the Withings app, giving you access to tailored health insights and goal-setting tools. Moreover, you can sync it with your favourite compatible apps and fitness programs to further simplify your fitness management system.
  • Streamlined Performance: For enhanced accuracy, this Withings Body Scale intuitively adjusts its measurements according to your Wi-Fi location to compensate for gravity. It also employs Position Control technology, which helps you centre your weight using on-screen visual cues.
  • Fit For The Whole Family: This digital glass scale by Withings can accommodate up to 8 user profiles, making it great for whole family use. It also comes with an automatic recognition function that identifies the current user by subtle weight differences.
  • Long-Lasting Battery: Powered by AAA batteries, the Body Digital Glass Scale offers up to 18 months of usage. Now you can track your weight for longer with no interruptions!
Specifications
All Product Details
Brand Withings
Product Type Bathroom Scales
Model Number WBS06-WHITE
Colour White
Scale
Measurement Range Max 180kg
Units of Measure KG
Material Type Tempered Glass
Maximum Number of User 8
BMI Calculator Yes
Anti-Skid Feet Yes
Safe Rounded Glass Corners Yes
Automatic Calibration Yes
Display
Screen/Panel Type LCD (Liquid Crystal Display)
Screen-Size 2.4"
Screen Resolution 128 x 64
Battery
Battery Type AAA Battery
Battery Life Up to 18 months
Connectivity
Wired / Wireless Wireless
Wireless Frequency Bands 2.4 GHz
Connectivity Type Bluetooth, Wi-Fi
Maximum Paired Devices 8
Durability
IP Rating IP22
Durability Feature Splash Resistant
Additional Features
Compatibility iPhone, iPad, or iPod touch with iOS 12 or later, or smartphone/tablet with Android 8 or later (cannot be set up from a computer)
Software / App Compatibility
App Enabled Yes
Compatible App Withings, Apple Health, Samsung Health Apps
Compatible Mobile Operating System Android, iOS
Regular Software Updates Yes
Dimensions
Product Width 32.7 cm
Product Depth 2.3 cm
Product Height 37.7 cm
Product Weight 0.6 kg
Warranty
Manufacturer 12 Months
Reviews

Expert Reviews


Customer Reviews


Delivery
Delivery

We aim to dispatch orders within 2 days. Delivery costs are calculated based on your location and the size of your order. Furniture may take up to 8 weeks to deliver as most products are made specifically for your order. Some Customer Direct products are shipped from overseas and may take longer to arrive. Some goods may take longer to deliver if a product is currently not in stock. A staff member will contact you where this occurs.

Easy returns

If you feel your product has failed a Consumer Guarantee (as defined by New Zealand Consumer Law) then don't worry you can easily return it to your local Harvey Norman store. We'll even pay for the postage if you live in an area where there is no store. Our returns policy covers any purchased item ( conditions apply).

Questions & Answers
Array

Recommended for you

    ✖

    Please confirm your selection

    Store Picker

    Travel Mode

    Stores